Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.
unavailable — hosted endpoints aren’t versioned
nuget
HorizunMsProjectMcp
Pick your client — the config below is generated for this server. Copy respects the “Pin version” switch above.
This server ships as a downloadable bundle: HorizunMsProjectMcp
Format verified against the official Claude Desktop docs ↗.
This server ships as a downloadable bundle: HorizunMsProjectMcp
Format verified against the official Claude Code docs ↗.
This server ships as a downloadable bundle: HorizunMsProjectMcp
Format verified against the official Cursor docs ↗.
This server ships as a downloadable bundle: HorizunMsProjectMcp
Format verified against the official VS Code docs ↗.
This server ships as a downloadable bundle: HorizunMsProjectMcp
Format verified against the official Windsurf docs ↗.
⭐ 7 stars · 最近更新于 16 天前 · MIT license
Horizun Project MCP An MCP server for Microsoft Project that needs neither Java nor Microsoft Project — and tells you the truth about what it wrote. It works as a PMO, not as a software operator. It does not just click through Microsoft Project on your behalf: it plans, controls and reports the way…
Summary from the project README — github.com/HorizunGroup/horizun-msproject-mcp
Distributed as nuget, listed under Developer Tools. Review our MCP security guide before granting access to real data.
Horizun Project MCP An MCP server for Microsoft Project that needs neither Java nor Microsoft Project — and tells you the truth about what it wrote. It works as a PMO, not as a software operator. It does not just click through Microsoft Project on your behalf: it plans, controls and reports the way
Run the install command shown above, then paste the config for your client (Claude Desktop, Claude Code, Cursor, VS Code or Windsurf) into its MCP settings and restart the client.
The MCP server itself is free to install. The source is public on https://github.com/HorizunGroup/horizun-msproject-mcp. Any third-party service it calls may require its own API key and account.
Any MCP-compatible client can use it, including Claude Desktop, Claude Code, Cursor, VS Code, Windsurf and custom agents.
Publish this server? Link back with a badge on your README or site — copy either snippet.
Markdown
[](https://mcpnav.net/server/horizun-msproject-mcp/)
HTML
<a href="https://mcpnav.net/server/horizun-msproject-mcp/"><img src="https://mcpnav.net/badge/horizun-msproject-mcp.svg" alt="Listed on MCPNav" height="20"></a>